Built on piles,
up and down
the country
- 1,450Piles installed
- 15Projects completed
- 60+ yrsWarranty
A sample of the work Offsite Bases has delivered. Residential, developer and commercial.
- Project type
- Single-storey domestic extension, mid-terrace property
- Scope
- Design and installation of helical pile and galvanised steel ring beam foundation
- Site conditions
- Restricted rear access, multiple drainage runs through the garden
The Project
This single-storey extension to a mid-terrace house in Carshalton, Surrey, presented two constraints that made a traditional foundation approach impractical: tight rear access typical of terraced properties, and multiple drain runs crossing the garden directly beneath the proposed extension footprint. Offsite Bases was appointed to design and install a helical pile and galvanised steel ring beam foundation as a direct alternative to a mass concrete trench fill foundation.
The Challenge
With several drains running through the site and a restricted, tight access typical of a mid-terrace plot, a conventional trench fill foundation would have required complicated bridging details to span the drainage runs — adding design complexity, cost, and time to a relatively small extension. The scale of the extension made that complexity disproportionate to the size of the job, and the access constraints made a traditional dig-and-pour approach harder to execute efficiently.
The Solution
A helical pile system paired with a galvanised steel ring beam was specified as the foundation solution. Piles could be positioned to avoid the existing drainage runs without the need for bridging structures, and the system's low-disturbance installation suited the restricted access on site.
The Programme
The foundation was installed and ready for the contractor to build on within two days:
- Day 1: Piles installed
- Day 2: Galvanised steel ring beam installed, along with the beam and block floor
- Day 3: Main contractor returned to site and began superstructure works
No spoil was generated or removed through the house — a meaningful benefit on a restricted-access, mid-terrace site.
The Results
- No bridging details required over the existing drainage runs, simplifying the design and removing a cost and time burden from the project
- Foundation complete and ready to build on in two days, with the contractor on site building by day three
- No spoil removal through the house, avoiding disruption on a tight-access terrace property
- A quick, sustainable alternative to a mass concrete trench fill foundation, suited to constrained urban sites with services in the ground
The Outcome
The project demonstrates how a helical pile and ring beam foundation can resolve site constraints — restricted access, buried services, tight programmes — that would otherwise add significant complexity and cost to a traditional concrete foundation, particularly on smaller domestic extensions where that complexity is disproportionate to the scale of the build.
- Project type
- Single-storey extension to a detached property, replacing an existing conservatory on the same footprint
- Scope
- Design and installation of helical pile and beam foundation
- Site conditions
- Close proximity to a public sewer on the rear elevation
The Project
An existing conservatory on a detached property was demolished and replaced with a single-storey extension on the same footprint. The rear elevation of the extension sat in close proximity to a public sewer, raising a specific foundation design constraint the contractor needed resolved before work could proceed.
The Challenge
With the extension footprint so close to the public sewer, the contractor was concerned that a conventional concrete foundation could cause heave, potentially displacing or damaging the pipe. Any foundation solution needed to avoid placing additional load onto the drain while still providing an adequate footprint so close to the boundary.
The Solution
Offsite Bases designed a helical pile and beam foundation with piles positioned at a safe distance from the drain and installed below the pipe's invert level, ensuring no additional load was transferred onto it. The system avoided the excavation a concrete foundation would have required in that location, removing the heave risk to the sewer entirely rather than attempting to design around it. Piles and beams were both installed in a single day, giving the contractor a fast route to a safe, engineered foundation.
The Results
- No additional load placed on the public sewer, with piles installed below invert level at a safe distance from the pipe
- Heave risk to the drain removed, rather than managed, by avoiding the excavation a concrete foundation would have needed
- Piles and beams installed in a single day, a significantly faster alternative to digging and casting a concrete foundation in a constrained, sensitive location
- Minimised risk of damage to existing services, protecting an asset the contractor would otherwise have needed to design carefully around
The Outcome
By replacing a conventional dig-and-pour foundation with a helical pile and beam solution, Offsite Bases gave the contractor a quick, low-risk way to extend right up to a sensitive drain run — without the heave concerns, load transfer risk, or programme delay a concrete foundation would have brought to this site.
- Project type
- Single-storey extension to an existing outbuilding, primary school
- Scope
- Design and installation of helical pile and ring beam foundation, forming a platform for a traditional-build extension
- Site conditions
- Mature trees close to the building, restricted site access
The Project
Planning permission was granted to extend an existing outbuilding at a primary school in Weybridge. The site sat close to a number of mature trees, and the extension was to be built as a traditional single-storey structure once a suitable platform was in place. The main contractor appointed Offsite Bases to install a series of helical piles and ring beams to form that platform, as an alternative to a conventional concrete foundation.
The Challenge
Trial pits dug on site exposed a number of significant tree roots close to the proposed extension. The proximity of the trees ruled out the foundation depths a concrete solution would normally require, and installing concrete foundations in that location risked serious damage to the root systems — a problem for a site with nearby protected trees and unlikely to be acceptable to planners in any case. Restricted access to the site added a further constraint that a conventional foundation approach would have struggled with.
The Solution
A series of helical piles and ring beams was designed and installed to form a stable platform, allowing the main contractor to build a traditional single-storey extension on top without disturbing the surrounding tree roots or requiring the deeper excavation a concrete foundation would need. Torque readings were taken during installation to verify pile capacity on site, with calculations submitted and approved before the contractor proceeded with the superstructure.
The Results
- No damage to protected tree roots, avoided entirely by piling around and past the root zone rather than excavating through it
- A viable foundation solution where concrete depths were ruled out by the proximity of mature trees
- Installation suited to restricted site access, where a conventional foundation approach would have been more difficult to execute
- Verified, approved design — torque readings taken on site and calculations submitted and approved before the build proceeded
The Outcome
Offsite Bases' helical pile and ring beam platform gave the main contractor a foundation solution that a concrete alternative could not have delivered on this site — protecting the surrounding trees while still forming a solid, engineered base for a traditional single-storey extension.
- Client
- Volumetric (a subsidiary of The Hill Group)
- Scope
- Design and installation of helical pile and ring beam foundations
- Sector
- Modular/offsite housing — homes for the homeless
The Project
Volumetric, part of The Hill Group, manufactures modular housing pods off-site for a scheme delivering homes for people experiencing homelessness. Offsite Bases was appointed as subcontractor to install a fast, sustainable foundation system capable of supporting the pods on a site with contaminated ground — conditions that ruled out a straightforward traditional approach. Helical piles and a ring beam were specified as the foundation solution: a system that avoids the excavation, spoil removal, and curing time associated with conventional concrete foundations, and one well suited to constrained or contaminated ground where minimising disturbance matters.
The Challenge
Modular pods need to land on a foundation that is precisely level and accurately positioned — any error has to be corrected after the pod is already on site, which is slow and labour-intensive. With a concrete foundation, that typically means shimming to correct levels and physically shifting heavy pods to get them into the right position, adding time and cost to every installation. The contaminated ground on this site added a further constraint, making a low-disturbance foundation system a priority alongside speed and accuracy.
The Solution
Offsite Bases installed helical piles and ring beams across the site, engineered to the tolerances the modular build required. The system was installed directly into the ground without the excavation or curing time of a concrete alternative, addressing both the contamination constraint and the programme pressure of a fast-moving modular build.
The Results
- Installation accuracy of 0–2mm, achieved on site — precise enough that pods landed correctly without post-installation adjustment
- Approximately 11 minutes per pile to install the foundation, a significant increase in speed compared with a traditional concrete approach
- No shimming or repositioning required — pods were placed directly onto accurately set piles and ring beam, removing a step that typically adds time and labour to modular installations
- A sustainable, low-disturbance solution suited to the site's contaminated ground conditions
The Outcome
The project was delivered successfully, with The Hill Group reporting high satisfaction with both the speed and precision of the installation. Offsite Bases is now looking forward to further collaboration with The Hill Group on future projects.